Enterprise Systems.Operations need one shared source of truth, not another spreadsheet.
We model workflows, roles, data and exceptions before building dashboards, modules and integrations. The result should be a system teams can operate, govern and extend.
- No hidden fees
- Free 30-minute consult
- Replies within hours on business days
ToanKhon DMS, Strata WMS, Forge OS and Mekong ERP show distribution, warehouse, manufacturing and trade operations.
A strong fit when operations are fragmented across tools, teams and versions of the data.
A short discovery phase determines whether to integrate, replace or build incrementally.
- 01Orders, inventory, customers or production are reconciled manually across multiple sources.
- 02Several roles share a workflow but each team works from a different version of the truth.
- 03The current system lacks APIs, permissions, audit trails or timely operational reporting.
From operating model to production-ready system.
Scope follows value flows and risk instead of inflating estimates with module count.
Workflow, role and data discovery
Domain architecture, permissions and state models
Operational dashboards, modules and alerts
APIs, integrations and data migration planning
- Business analysis
- DMS · ERP · WMS · MES
- Role-based access
- API integration
- Real-time data
- System handover
Build through verifiable operating slices.
Each stage produces a working flow that real users can test before the next module expands the system.
- 01
Operational discovery
Clarify roles, data, states and exceptions in the current workflow.
- 02
System design
Define domains, permissions, workflows, integrations and success criteria.
- 03
Pilot build
Put one important operating flow in front of real users and real data.
- 04
Scale & handover
Expand modules, test, deploy and transfer operating documentation.
The proof is in the operating model, not a module count on a slide.
These cases demonstrate distribution, warehouse and manufacturing systems grounded in specific data and roles.
Case from the public archiveToanKhon DMS
ToanKhon DMS manages 12,500+ outlets, orders, routes, inventory and promotions through a multi-tenant architecture.
Read the case study
Case from the public archiveStrata WMS
Strata WMS connects inbound, putaway, picking, packing, shipping and a warehouse digital twin across 30+ modules.
Read the case study
Case from the public archiveForge OS
Forge OS models 18 plant modules, 28 machines, OEE, quality, maintenance and traceability.
Read the case studyWe do not begin with a module shopping list.
When process ownership, source data and decision rights are unclear, more software only digitises confusion. Discovery may conclude that simplifying or integrating the current system is the responsible first move.
Questions to resolve before choosing an ERP or commissioning a custom system.
Scope depends on data condition, required customisation, integrations and the organisation's ability to change its process.
01Should we buy an ERP or build a custom system?
The answer depends on workflow differentiation, integration constraints and the cost of changing operations. Discovery compares both paths explicitly.
02Can you integrate our existing systems?
Yes. We assess APIs, data condition and access before recommending integration, replacement or parallel operation.
03How soon can the first workflow be tested?
A focused pilot commonly takes 6 to 10 weeks after scope, data and operational ownership are confirmed.
Put the most important workflow into a system teams can see and control.
Send the current workflow, spreadsheet or system map. We will identify the constraint and the smallest useful pilot.
View every service